Here are documents associated with the Biloxi Beach Connector Phase I (Popp’s Ferry Extension) BUILD Transportation Grant Application.
- City of Biloxi 2009 Comprehensive Plan
- “Plan for Opportunity,” Regional Sustainability Plan for the Mississippi Gulf Coast
- Environmental Documents
- 2040 Mississippi Unified Long-Range Transportation Infrastructure Plan
- 2040 Metropolitan Transportation Plan for the Mississippi Gulf Coast
- At-Grade Railroad Crossing Report (52 MB)